Compagnons du devoir training center in Strasbourg

Context

  • Customer: Association Ouvrière des Compagnons du Devoir

 

  • Type: Building

 

  • Surface area: 6400M2

 

  • Opening: June 2023

Project details

Compagnons du devoir training center in Strasbourg

For their new training center in Strasbourg, the Compagnons du Devoir chose to carry out the project in BIM right from the competition phase, with a BIM agreement specifying the modes of collaboration.

 

This anticipation enabled us to produce a highly accomplished technical synthesis, with execution-level DCE plans, and also to manage the consultation of contractors via the collaborative platform. For example, companies were able to export quantities from the digital model. At the end of the project, the platform also centralized invoicing.

 

The use of BIM encouraged prefabrication, which concerned 70% of the elements used. It also contributed to the organization of the worksite: all equipment was modeled, for the benefit of prevention and flow performance. On site, the use of an augmented reality headset, with a hologram projected onto the structure, enabled us to check the conformity of the execution with the model.

 

MOA: Association Ouvrière des Compagnons du Devoir et du Tour de France. EMO: Nunc Architects. Engineers: Solares Bauen, ID, PrismaBIM, EsmatSolution, Sib, Gecobat, Sedime, WM Projet, Veritas and Apave.
Contractors: Seltz, Isosan, Eimi, Beyer, K3E, Atalu, Girold, BCM and Act.

Challenges

Les Compagnons du devoir needed a collaborative platform for managing project documentation and validating it through workflow circuits. The platform had to be sufficiently modular to enable all those involved in the project to access documentation selectively and securely.

Solutions

Les Compagnons du devoir needed a collaborative platform for managing project documentation and validating it through workflow circuits. The platform had to be sufficiently modular to enable all those involved in the project to access documentation selectively and securely.

On our project, and right from the APS phase, the AxeoBIM platform enabled us to optimize collaboration, collect and share information and documentation, and provide access to and make available to 150 project participants the same database of documents codified according to our naming convention (6,000 documents, plans, digital mock-ups, data sheets, etc.).

Visualize digital models. Another very useful tool project management and collaboration, that of digital document visas.