The AxeoBIM platform has been selected by Engie Axima for the Montpellier Regional Conservatory (CRR) project.
About the Regional Conservatory Project:
Following a strong growth, the Metropolis of Montpellier has chosen to relocate the Conservatoire à Rayonnement Régional (CRR), in a new space, the former maternity Grasset.
The implementation of a delicate deconstruction operation was carried out for 3 months and was completed in early September.
The new Conservatoire à Rayonnement Régional of Montpellier will be composed of many new spaces such as
7 dance studios
-10 group practice rooms
-1 400-seat auditorium for the public
-57 teaching rooms
-1 theater studio
-13 music training rooms
-1 studio for physical awakening
The project is expected to be completed in 2021.
A word from the architect:
" Integrated into the vegetation already present on the site, the conservatory is designed as a vertical village with volumes dotted with patios, terraces and hanging gardens "
Alain Bretagnolles - Architecture-Studio
Credits: